OFFICE
The RH Construction web site includes advanced interactive graphics and features that require the presence of the Adobe Flash Player 8 (or above) web browser plugin. Unfortunately, we could not detect the required version of the Flash Player plugin on your system.
Flash Player is a free download that will enable you to view not only our site, but many other sites on the World Wide Web that use the same technology. You can download Flash Player at the link below, then reload rhconst.com to view all of our available content.
Get the latest Adobe Flash Plugin:
Triangle Corporate Park III
- Tigard, OR
- 136,000 s.f.
This 6-story Class A building has a steel structure with an exterior of precast concrete panels at first floor and brick veneer and glass curtainwall above. The concrete basement 'daylights' at one end for shipping/receiving operations, and includes a fitness center for the tenants, plus access to an exterior sports court. Lobby finishes are cherry, maple, glass and steel. Extensive electrical and data systems support the operations of the main tenant, OrCAD.
Similar Projects:
adidas VillageCMD
Advantis Credit Union Corp. Office
Electric Lightwave
