EDUCATION

R&H has made the grade as contractor on all types of Education projects, from small classroom remodels to ground up institutions. We meet tight timelines to accommodate school calendars and use the highest level of security, sensitivity and respect within occupied schools.

The RH Construction web site includes advanced interactive graphics and features that require the presence of the Adobe Flash Player 8 (or above) web browser plugin. Unfortunately, we could not detect the required version of the Flash Player plugin on your system.

Flash Player is a free download that will enable you to view not only our site, but many other sites on the World Wide Web that use the same technology. You can download Flash Player at the link below, then reload rhconst.com to view all of our available content.

Get the latest Adobe Flash Plugin:

>>DOWNLOAD

St. Anthony's School

  • Tigard, OR
  • 24,562 s.f.

This project encompasses the construction of a new, 11,300 s.f. gymnasium and a remodel and addition to the existing middle school. The new gym is a combination of concrete tilt-up construction and structural steel. Included in the gymnasium building is a lobby, bathrooms, a kitchen and a mechanical/electrical room. The remodel of the middle school includes demolition, relocation of existing rooms, small building additions and typical tenant improvement work.

Project Profile

Similar Projects:

St. Mary's Academy Auditorium