OFFICE
The RH Construction web site includes advanced interactive graphics and features that require the presence of the Adobe Flash Player 8 (or above) web browser plugin. Unfortunately, we could not detect the required version of the Flash Player plugin on your system.
Flash Player is a free download that will enable you to view not only our site, but many other sites on the World Wide Web that use the same technology. You can download Flash Player at the link below, then reload rhconst.com to view all of our available content.
Get the latest Adobe Flash Plugin:
Ziba Design Headquarters
- Portland, OR
- 69,425 s.f.
- LEED-NC Gold Certification
- Construction waste recycling
- Locally reclaimed fir used for siding and flooring
- Polished concrete floors
- Daylight harvesting
The new headquarters campus for ziba design recently completed construction in Portland's Pearl District. The building features two stories of office space above ground floor retail tenant space and achieved LEED-NC Gold status.
Similar Projects:
Wilsonville Town Center360 Bond Building
adidas Village
